roject Name: | Project Location: |
Completed by: | Date: |
STATIONARY SCAFFOLD INSPECTION CHECKLIST
YES | NO | ACTION/COMMENTS | |
Scaffold components and planking in safe condition for use and planks graded for scaffold use? | |||
Frame spacing and sill size capable of carrying intended loading? | |||
Competent person in charge of erection and to inspection? | |||
Sills properly placed and adequate sized? | |||
Screw jacks been used to level and plumb scaffold instead of unstable objects? | |||
Base plates and/or screw jacks in firm contact with sills and frame? | |||
Scaffold is level and plumb? | |||
Scaffold legs braced with braces properly attached? | |||
Guard railing in place on all open sides and ends? | |||
Overhead protection or wire screening been provided where necessary? | |||
Scaffold been tied to structure at least every 30' in length and 26' in height? | |||
Free standing towers been guyed or tied every 26' in height? | |||
Brackets, tube and clamp, and accessories been properly placed with nuts and bolts tightened? | |||
Scaffold free of makeshift devices or ladders to increase height? | |||
Planks have minimum 12" overlap and extend 6" beyond supports? | |||
Toe boards properly installed? | |||
Conditions such as power lines, wind loading, etc. controlled? | |||
Safe way to get on and off the scaffold without climbing on cross braces? | |||
Front face within 14 inches of the work or within three feet for outrigger scaffolds? |