Quantcast
Channel: EHSQL Greenko -AMGreen Group (Env-Energy ,Health,Safety, Security , Social Ac. Quality-Lab) Tec.Ser.
Viewing all articles
Browse latest Browse all 9206

OPTION CHECKLIST NO. 10: FURNACES & REFRACTORIES

$
0
0
OPTION CHECKLIST NO. 10: FURNACES & REFRACTORIES
• Check against infiltration of air: Use doors or air curtains.
• Monitor O2 /CO2/CO and control excess air to the optimum level.
• Improve burner design, combustion control and instrumentation.
• Ensure that the furnace combustion chamber is under slight positive pressure.
• Use ceramic fibres in the case of batch operations.
• Match the load to the furnace capacity.
• Retrofit with heat recovery device.
• Investigate cycle times and reduce.
• Provide temperature controllers.
• Ensure that flame does not touch the stock.
Energy

Viewing all articles
Browse latest Browse all 9206

Trending Articles